The Compute Utilization Dashboard provides visibility into cluster usage. The goal is to help understand job's efficiency and spot underutilized resources. After reading this document, if you have any doubts about how to best leverage the dashboard, please reach out to the IDT team.

As a reminder, optimizing GPU usage accelerates research velocity (your work and the work of others). On the flip side, suboptimal utilization holds you back, and prejudices the entire Mila community.

Core concepts to understand your utilization

How is compute power calculated and represented?

Definition of RGU

The RGU (Reference GPU Unit) was implemented by the Digital Research Alliance of Canada to serve as the benchmark GPU unit across different GPU models. Relying on the standard RGU unit enables monitoring to be more accurate and more robust in a context of diverse and evolving compute supply.

For reference, 1 A100-40Gb = 4 RGUs.

Calculation of RGU

The compute power allocated to a job is the product of 3 elements: the type of GPU (each amounting to a specific RGU value), the number of GPUs, and the elapsed time during which the job runs. Compute power is typically expressed over a period to measure total resource consumption over time.

Example: Getting 1 RGU for 1 week equals 1 RGUยทw. Getting 2 RGUs for half a week also equals 1 RGUยทw.

Timestamp

In the dashboard, compute allocation is by default segmented by week based on submit time. The entire compute allocation for a job is displayed in the week the job is submitted.

Future change

This will change in future versions of dashboard. The compute allocation will be segmented by week based on execution time. If a job runs across two calendar weeks (e.g., starts in Week 1 and finishes in Week 2), its fixed metrics (RGU value, GPU number) will remain the same, but its elapsed time will be split accordingly (e.g., ~6 days accounted for in Week 1, and ~4 days in Week 2).

Cost

For reference, 1 RGU.year costs approximately 1100$, so 1 RGU.w = 21$, and 1 RGU.h = 0.125$.

How is waste defined?

Various cluster statistics are available. We choose to look at the two following measurements:

gpu_utilization

This metric reports the proportion of the job duration during which one or more kernel was running on the GPU. This represents an intuitive measurement about how โ€œbusyโ€ the GPU was, but the downside is that it does not depend on how much of the hardware is actually in use. When gpu_utilization is low or equals zero, there is obvious waste and inefficiencies to tackle quickly.

However, this measurement can reach 100% without any guarantee that a GPU is being used optimally.

SM occupancy (SMO)

The Compute Utilization Dashboard is based on Streaming Multiprocessor (SM) Occupancy that better represents the notion of a GPU being used to its full compute potential.

It measures the ratio of active threads/warps on the GPU relative to the theoretical maximum the processor (SM) can handle in parallel. It indicates how effectively your code leverages the raw compute power allocated to you. High SM occupancy means the code is executing densely and efficiently on the GPU; whereas low SM occupancy means most of the GPU is unused.

What is an acceptable waste level?

It is almost impossible to achieve an SMO close to 100%. Anything above 80% is spectacularly good. Refer to the below benchmark to understand and interpret your SM occupancy:

  • โ‰ฅ 50%: Excellent utilization

  • 30% - 50%: Good utilization, little margin for optimization

  • 15% - 30%: Good utilization, with room for improvement

  • 5 - 15%: Poor utilization, vast room for improvement

  • < 5%: Critical waste

We consider the 15% threshold as a good starting point to focus our attention. Below 15% smo, there are definitely improvements to be implemented to tackle typical issues (e.g., CPU bottlenecks, slow data transfers, batch size too small), leading to wasted compute power (learn more). Therefore,

  • the chart โ€œRGU allocated vs usedโ€ in the dashboard is framed around Efficiency levels: the GPU power is split into Used, Acceptable Idle, and Critical Waste.

  • if your smo is below 15% for 2 weeks straight, you will receive a โ€œwaste notificationโ€ inviting you to act and optimize your jobs.

Dashboard layout

๐ŸŽ›๏ธ Filter bar (Top)

Allows you to adjust the analysis window (Start / End), time aggregation (Period), target cluster, or job status (Job states).

Tip

Click "Update" to apply your filters, or "Reset" to restore default settings.

Dashboard filter bar

๐Ÿ“Š Main visualizations

RGU allocated vs used

This chart tracks your efficiency over time based on SM occupancy, categorizing your RGUยทw into three states:

  • ๐Ÿ”ต Used: The allocated compute actively performed computations.

  • ๐Ÿ”ด Critical Waste (Below 15% threshold): Unused compute from jobs running under the 15% minimum efficiency thresholds. This is the unacceptable portion of unused compute from jobs that failed to reach our minimum efficiency threshold (15% SM occupancy). This represents direct, preventable resource loss.

  • ๐ŸŒ Acceptable Idle (Above 15% threshold): Unused compute capacity remaining above the 15% minimum threshold. The remaining unused compute allocated to jobs that met or exceeded the 15% efficiency baseline.

  • โšช No data: Telemetry could not be gathered (e.g., the cluster running the job is not yet connected to the service).

The chart also shows the mean SM occupancy (in black) and gpu_utilization (in purple) for each week, for jobs that have been submitted during that week. Hover over the chart to see the exact values.

Goal: Remove Critical Waste first, then shift from Acceptable Idle to Used.

Note

IDT is working with DRAC to retrieve telemetry data and reduce No data portion.

RGU by cluster

This stacked bar chart shows total RGU consumption breakdown by cluster (mila, narval, tamia, etc.) over time.

Goal: Take advantage of all available clusters, especially DRAC clusters, which often have higher available capacity than the local Mila cluster. IDT recommends using tools like milatools and cluv to easily submit jobs across all clusters.

Job table

An interactive table listing all executed jobs along with key properties: Job ID, submission/start/end dates, final status (COMPLETED, FAILED, etc.), and detailed metrics on requested, allocated, and actually used compute.

Goal: Provide granular insights to help you identify specific areas where your cluster runs can be optimized.

Dashboard features

Click to focus

Click any bar in a chart to focus on that specific time period. The Job table will automatically filter to match your selection. To clear the focus, click the bar again or select "Clear focus" in the filter bar.

Dashboard filter bar focus

Comments